Menu
  1. Expertise
  2. Markets
    1. Aviation
    2. Build to Suit & Headquarters
    3. Building Transformation & Adaptive Reuse
    4. Cities & Urban Design
    5. Climate Action & Sustainability
    6. Consumer Goods
    7. Critical Facilities
    8. Culture & Museums
    9. Digital Experience Design
    10. +Education
    11. Energy
    12. +Entertainment
    13. Financial Services
    14. Foundations, Associations & Organizations
    15. Government & Defense
    16. Healthcare
    17. Hospitality
    18. Industrial & Logistics
    19. Live Performance Venues
    20. Media
    21. Mixed Use Retail Centers
    22. Mobility & Transportation
    23. Office Developers
    24. Product Development
    25. Professional Services
    26. Residential
    27. Retail & Consumer Experience
    28. Sciences
    29. Senior Living
    30. Sports
    31. Strategy
    32. Technology
    33. Wellness
  3. Offices
  4. Affiliates
  5. News
  6. About
  7. Contact Us

 

 

 

All  ⮟      Featured  ⮟      By Topic  ⮟      By Office  ⮟

Upper Chesapeake Medical Center

Upper Chesapeake Medical Center | Bel Air, Maryland

A 2 MW Trigeneration System to Optimize Energy Performance

Located in Bel Air, Maryland, the Upper Chesapeake Medical Center was home to an aging energy system that wasn’t optimized for the hospital’s usage or prepared to support growth. CMTA brought decades of experience to bear and designed a Trigeneration system (CHP), producing cooling, heat, and power from a single fuel source.

Project At A Glance

  • Cost: $8,000,000
  • Completed: 2014
  • Prime Mover: 2MW Reciprocating Engine
  • Fuel Source: Natural Gas
  • Heat Recovery: Exhaust-Fired Steam Generator, Multi-Energy Absorption Chiller
  • Savings: $9,000,000 over the course of service life

Awards

  • 2016 EPA ENERGY STAR CHP Award
  • 2016 ASHRAE Region III Technology Award - First Place
  • 2016 ASHRAE National Technology Award
  • 2014 Trailblazer Award - Maryland Hospitals for a Healthy Environment

The Challenges

  • Integrating CHP into the operating hospital central plant (hot water, steam and chilled water systems)
  • Integrating CHP into the operating hospital electrical distribution (normal and emergency power systems)
  • The hospital required additional cooling capacity with no capital expenditure

The Solutions

The system was optimized to provide the best economic payback for the system owner, who executed a Power Purchase Agreement with the host facility (UCMC). This process involved measuring and collecting energy consumption data at the facility over the course of the project development process. This data was used in the development of an energy simulation to predict potential production values for the system. CMTA developed the simulation and software in-house as commercially available software was not deemed flexible enough to allow some of the innovative strategies that were examined and eventually included in the final design. The system has historically produced 10-13 million kWh annually and is predicted to deliver over $9 million of savings over the course of its service life.

The power generator and heat recovery steam generator were paired with a multi-energy absorption chiller to provide additional cooling capacity at the facility’s central plant. The chiller helps fill voids in the hot water demand that might otherwise result in the engine wasting jacket water heat and provides the hospital with an additional 350 tons of cooling that allows the central plant to serve the entire facility peak demand without one of the electric chillers. Prior to the addition of the absorption chiller, the plant was struggling to keep up with increasing chilled water demand without sacrificing equipment redundancy.

The system employs an electrical load-following scheme that sets it apart from similar projects. This control scheme was carefully studied and scrutinized during the design to ensure that the extra investment in capacity would serve the owner efficiently. The load-following sequence modulates the system output in response to real-time electrical and thermal demand data to produce as much energy as possible, without exceeding what the facility requires.