Menu
  1. Expertise
  2. Markets
    1. Aviation
    2. Build to Suit & Headquarters
    3. Building Transformation & Adaptive Reuse
    4. Cities & Urban Design
    5. Climate Action & Sustainability
    6. Consumer Goods
    7. Critical Facilities
    8. Culture & Museums
    9. Digital Experience Design
    10. +Education
    11. Energy
    12. +Entertainment
    13. Financial Services
    14. Foundations, Associations & Organizations
    15. Government & Defense
    16. Healthcare
    17. Hospitality
    18. Industrial & Logistics
    19. Live Performance Venues
    20. Media
    21. Mixed Use Retail Centers
    22. Mobility & Transportation
    23. Office Developers
    24. Product Development
    25. Professional Services
    26. Residential
    27. Retail & Consumer Experience
    28. Sciences
    29. Senior Living
    30. Sports
    31. Strategy
    32. Technology
    33. Wellness
  3. Offices
  4. Affiliates
  5. News
  6. About
  7. Contact Us

 

 

 

All  ⮟      Featured  ⮟      By Topic  ⮟      By Office  ⮟

Baptist Health Lexington

Baptist Health Lexington | Lexington, Kentucky

Less Energy Usage = More Patient Care

CMTA was proud to provide consultation and commissioning services for Baptist Health Hospital’s patient tower addition in Lexington, Kentucky. This project encompassed 913,000 square feet of renovation and new construction to help bring state-of-the-art health care to the Central Kentucky region.

Project At A Glance

  • Size: 450,000 Square Feet
  • Cost: $250,000,000
  • Completed: 2015
  • Modeled Energy Use: 256 EUI
  • Performed Energy Use: 251 EUI

The Challenges

  • Decreasing energy usage without impacting patient experience
  • Marrying renovation and new construction, seamlessly
  • Operating within budget constraints
  • Managing a multi-phase schedule

The Solutions

CMTA was able to bring several value strategies to the table for Baptist Health during this project, including First 30 and Design Innovation. We met with Baptist at the very beginning of the project and analyzed the capacity and the energy usage of the existing central plant. Studying their energy bills provided great opportunity for significant energy reduction.

Because we were marrying a renovation project to new construction, we had to utilize multiple energy-saving strategies to achieve maximum efficacy. A 1,000 ton heat recovery chiller was added to the central plant to utilize waste heat off of the compressor to heat the entire new building, portions of the old building, and all of the domestic water heating on the campus. The existing chiller plant operated with a traditional primary-secondary pumping arrangement. We switched this to a variable flow primary system to increase plant efficiency. This was designed and coordinated to prevent any downtime to the hospital to maintain patient comfort and safety. Additionally, all of the condensation from the air handling units in the new patient tower will be collected and pumped back to the cooling towers for makeup water.

Our overall schedule was impacted by budget constraints, as the client chose to pay for the energy improvements as they went. This led to a multi-phase schedule, as well as multiple bid packages, which we helped the client manage.